FEATURED PROJECTS

A selection of representative works from over three decades of activity

img 4552 ruta 8 cropped
2024 – ROAD infrastructure

Route 8 Lane Duplication Section between Routes 101 and 9

Detailed engineering design for the 35 km duplication of Route 8, including traffic analysis for pavement design based on axle load data from weigh stations and historical traffic growth, geometric design, intersection design, drainage and earthworks calculation.

img 4560 intercambiador ruta 9
2025 – ROAD infrastructure

Route 8 / Route 9 Interchange

Design of a grade-separated interchange at the junction of Routes 8 and 9, replacing the existing roundabout. The design incorporates safe pedestrian underpasses in the surrounding area. (Currently under construction.)

modelo udelar
2015 – TRAFFIC STUDY

Traffic Impact Assessment – UDELAR University Building

Traffic impact assessment for a new university building on the UDELAR campus (Hospital de Clínicas, CUDIM, School of Dentistry). The study included simultaneous classified counts at all campus intersections and a microsimulation model of Avda. Italia and Avda. Centenario, reporting level-of-service indicators for multiple time periods.

img 1510
2019 – PORT INFRASTRUCTURE

Reefer Container Yard – Port of Montevideo

Design of a reefer container yard at the Port of Montevideo for RTG (Rubber Tyred Gantry) crane operation. The pavement was designed using roller-compacted concrete (RCC).

20230604 202530
2015 – TRAFFIC STUDY

Traffic Impact Assessment – Antel Arena and Parking Design

Traffic impact assessment for the Antel Arena project, analysing demand scenarios for basketball games, concerts and events. Parking design based on estimated demand, including waiting and drop-off areas for buses and taxis.

j29c2 rgb 8 remesa 06 carcel punta rieles achicada
2016 – ROAD INFRASTRUCTURE – EARTHWORKS

Roads and Earthworks – UPPL Punta Rieles Prison

Design of external and internal road infrastructure for the new prison facility at Punta Rieles. Earthworks calculation for site preparation. Technical recommendations for perimeter security.

img 4536 ruta 101

Route 101 – Lane Duplication, Section between Routes 102 and 8

Detailed engineering design for the lane duplication of Route 101 between Routes 102 and 8. Pavement structure design, geometric design, earthworks and tie-ins. Drainage design aimed at minimising aquaplaning risk.

j28d4 rgb 8 remesa 06 bypass pando reducidaa

Pando Bypass

Original design of the Pando bypass, with analysis of multiple alignment alternatives. The project includes a new bridge over the Frasquito stream.

img 4539 bypass pando

Pando Bypass – Lane Duplication

Design of the lane duplication of the Pando bypass, including remodelling of the 3 existing roundabouts.

Ruta 55 - intercambiador Ruta 21

Route 55 – Access to Montes del Plata Pulp Mill, Conchillas

Design of the 12 km extension of Route 55 to the Montes del Plata pulp mill in Conchillas, Colonia, including a viaduct at the junction with Route 21. Concrete pavement. Construction supervision assistance. Periodic condition surveys in accordance with MTOP guidelines through final acceptance (7-year maintenance period).

p26b2 rgb 8 remesa 03 achicada

Montes del Plata Pulp Mill – Conchillas

Earthworks design (4,000,000 m³), perimeter road, platform grading and drainage system prior to plant construction, access control, pavement design for ocean pier and barge terminal. Construction supervision assistance. Analysis of the impact of log transport routes to the mill and log storage yards.

amya9941

Gertil Logistics Site – Camino al Bajo de la Petisa

Master plan for the site, detailed design for a 15,000 m² logistics warehouse (two units), pavement design and construction supervision.

ruta 5

Route 5 Lane Duplication – Preliminary Design (Km 69 to 112)

Geometric preliminary design, pavement structure assessment and drafting of technical specifications.

20220427 194850

Traffic Impact Assessments, Pavement Rehabilitation and Parking Design – Grupo Disco / Devoto / Geant

Traffic impact assessments for existing and new stores and logistics depots, pavement condition assessment and rehabilitation recommendations, parking and truck marshalling area design, construction supervision.

p1010021

Lane Duplication – Avda. Dr. Luis Alberto de Herrera (26 de Marzo to Ramón Anador)

Detailed design for the lane duplication of Avda. Dr. Luis Alberto de Herrera between 26 de Marzo and Ramón Anador streets. Construction supervision jointly with the Montevideo Municipal Authority

metadata start

Bonavita Street Duplication and Sabat Pebet Street Extension

Design of the Sabat Pebet Street extension to Bonavita Street. The existing pedestrian underpass was removed and an access ramp was constructed to address the level difference. Granite sett pavement.

20250413 174001

Traffic Impact Assessments and Access Design – El Dorado Supermarkets

Technical assistance to El Dorado Supermarkets for the installation and approval of new stores in Montevideo and Canelones. Traffic impact assessments, land-use feasibility studies, building permit applications and commercial premises licensing

20190129 163409

Traffic Impact Assessments – Frog Mini and Maxi Markets

Traffic impact assessments for the installation of multiple Frog market locations in Montevideo and Canelones.

sin título

Semi-pedestrianisation of Colón and Rincón Streets – Ciudad Vieja, Montevideo

Detailed engineering design based on the Montevideo Municipal Authority’s preliminary scheme for the transformation of Colón and Rincón streets. The new cross-section features a kerb-free surface with a vehicle lane delineated by bollards and a low-speed environment.

los eucaliptos

Los Eucaliptos Informal Settlement Regularisation – Maldonado

Within the framework of the MVOT / DINISU Plan Avanzar, in coordination with the Maldonado Municipal Authority, detailed engineering design for the road infrastructure of the Los Eucaliptos neighbourhood, formalising the existing road network and incorporating new streets.

img 8028

Access Design Mariscala on Route 8

Modification of the Route 8 section at Mariscala to provide safe access from the highway. The proposed geometry was validated using vehicle swept-path software and the signing scheme was updated.

ava la caleta cropped

Traffic Study and Access Design – AVA La Caleta, Avda. de las Américas

Traffic analysis to assess the development’s impact on Avda. de las Américas and Avda. a la Playa. Design of improvements to the service road and inter-avenue connection, incorporating safe pedestrian circulation. (Currently under construction.)

emplame olmos

Access Design – Olmos Industrial and Logistics Park

Redesign of access to Olmos Industrial Park for the installation of a weighbridge at the entrance, relocation ofaccess control, and paving of the area with dedicated truck and car waiting zones. Analysis of a new park entrance incorporating waiting areas and controlled access.

Moldes Ruibal

Offices and Warehouses – Moldes Ruibal, Cno. de los Horneros

Design of offices and warehouses for Moldes Ruibal: two warehouse buildings (phased construction) totalling 3,000 m² plus 300 m² of office space. Feasibility studies, urban and traffic impact assessments, site layout design, space distribution, vehicle swept-path analysis and site management.

dsc00831

Access and Internal Road Design – Zonamerica

Design of waiting and access areas for Zonamerica, truck swept-path review, weighing zones, geometric design of access roads to buildings, pavement structure design and technical specifications for procurement and construction.

olympus digital camera

Jacksonville Master Plan – Access and Internal Road Design

Assistance with the Jacksonville master plan development. Redesign of access from the roundabout at Routes 8 and 102, geometric and structural design of residential streets and connection to the perimeter collector ring road.

Scroll to Top